What type of documents does the Owner provide to the Contractor?

Prepare for the Architect Registration Examination (ARE) 5.0 Construction and Evaluation Test. Study with flashcards and multiple choice questions, complete with hints and explanations. Ace your exam!

The Owner provides surveys, legal limitations, and utility locations to the Contractor as part of the documentation necessary for the successful execution of a construction project. These documents are essential for ensuring that the Contractor has accurate information about the site, including any legal restrictions that may affect construction and the locations of utilities that could impact excavation and other construction activities.

Surveys are critical in establishing property boundaries and any existing conditions that must be considered during construction. Legal limitations may include zoning regulations, easements, and other legal constraints that the Contractor must comply with to avoid potential legal issues. Utility locations are vital to prevent disruptions and facilitate safe construction practices, as they help the Contractor identify where existing underground utilities are situated.

In contrast, construction specifications typically outline the technical aspects of the project and are usually developed by the design team rather than provided directly by the Owner. Payment schedules are usually part of the contractual agreement rather than documents that the Owner provides prior to construction. Project completion reports are generated post-construction to summarize the project's outcomes and are not provided at the beginning of the project.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy